Skip to main content
Greenfield food manufacturing plant

Greenfield food manufacturing plant

A new development in Mongolia with capacity to produce 250 million pounds of frozen potato products annually.

Client

Lamb Weston

Size

72,000 sq.m

PM Group Office

China

About the project

US Headquartered Lamb Weston is a global leader in french-fry production. PM Group has been supporting the company’s projects in China for over a decade. 

PM Group was EPCM provider for Lamb Weston’s latest project involving a new standalone potato processing facility in Ulanqab, Inner Mongolia.

This 72,000 sq.m. greenfield development sits on a 250,000 sq.m. site. The new facility consists of a production building, central utilities building, raw storage, admin building and WWTP.

Barry McFarlane
Barry McFarlane background

“The new facility is the result of the hard work and dedication of many team members, and I’m proud of their accomplishments.”

Barry McFarlane

Development Director, China

PM Group’s China team began with a 12 month site search and due diligence to identify the right location. 

Our team then led the project through Concept Design, Basis of Design, Engineering, Procurement and Construction Management overseeing over four million hours without a lost time incident.

Industry-leading standards

The facility has the capacity to produce 250 million pounds of frozen potato products annually. Built to Lamb Weston’s industry-leading standards, the facility features the latest equipment to support employee safety, food safety and quality, and sustainability.

Lamb Weston invested approximately $250 million in the new facility.



Background image

Contact Us

Thank you, we’ll be in touch shortly.

In the meantime you may find this content relevant to your interests. 
Talk soon.

Two men pictured standing in a modular vaccine facility.
Modular vaccines facilities a 'World First'